Allied Telesis AT-SBx81CFC960 User Manual
Page 112
Chapter 6: Installing the Power Supplies
112
Section II: Installing the Chassis
7. Lower the power supply locking handle to secure the power supply to
the chassis, as shown in Figure 50.
Figure 50. Lowering the Handle on the AT-SBxPWRSYS1 Power Supply
8. To install a second AT-SBxPWRSYS1 Power Supply, repeat this
procedure.
After installing the AT-SBxPWRSYS1 Power Supples, do one of the
following:
If you purchased the AT-SBxPWRPOE1 Power Supply for the ports on
the AT-SBx81GP24 PoE Line Cards, go to “Installing the AT-
SBxPWRPOE1 PoE Power Supply” on page 113.
Otherwise, go to Chapter 7, “Installing the AT-SBx81CFC960 Control
Card and Ethernet Line Cards” on page 125.
Note
Retain the tie wrap that comes with the power supply. You will use it
to secure the power cord to the chassis when you power on the unit
in “Powering On the AT-SBxPWRSYS1 AC System Power Supply”
on page 171.