beautypg.com

Figure 31: rack mounting hole locations – Allied Telesis AT-SBx81CFC960 User Manual

Page 93

background image

SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide

Section II: Installing the Chassis

93

3. Identify the lowest 1/2” screw hole pattern on the rack mounting rails

within the space reserved for the AT-SBx8106 Chassis.

4. Install one rack mount screw in each vertical rail, at the same height in

the top screw hole of the lowest 1/2” hole pattern, as shown in
Figure 31. The screws are used to support the chassis while you
secure it to the rack. Do not fully tighten the screws at this time. The
screw heads should protrude from the rack approximately 6.4 mm (.25
in).

Figure 31. Rack Mounting Hole Locations

5. After installing the two screws in the equipment rack, go to “Unpacking

the AT-SBx8106 Chassis” on page 94.

6.4 mm (.25 in)

Screw head

Top screw hole of the lowest 1/2” hole pattern