beautypg.com

Allied Telesis AT-SBx81CFC960 User Manual

Page 112

background image

Chapter 6: Installing the Power Supplies

112

Section II: Installing the Chassis

4. Check the power supply for its model name, shown in Figure 50, to

verify the module.

If the module is the AT-SBxPWRPOE1 PoE Power Supply, do not
continue with this procedure. Instead, perform “Installing the AT-
SBxPWRPOE1 PoE Power Supply” on page 115.

Figure 50. Verifying the AT-SBxPWRSYS1 Power Supply

5. Move the locking handle on the AT-SBxPWRSYS1 Power Supply to

the unlocked or up position. See Figure 51.

Figure 51. Unlocking the Handle on the AT-SBxPWRSYS1 Power Supply

This manual is related to the following products: