beautypg.com

Chapter 10, Verifying the hardware operations of the chassis – Allied Telesis AT-SBx81CFC960 User Manual

Page 209

background image

209

Chapter 10

Verifying the Hardware Operations of
the Chassis

This chapter describes how to verify the operations of the chassis. The
chapter contains the following sections:

“Using the LEDs to Verify the Chassis” on page 210

“Using Local Management to Verify the Chassis” on page 212

Note

Allied Telesis recommends using both methods to confirm the initial
operations of the chassis, controller cards, and line cards.

This manual is related to the following products: