Section ii, Installing the chassis, Section ii: installing the chassis – Allied Telesis AT-SBx81CFC960 User Manual
Page 79
79
Section II
Installing the Chassis
This section contains the following chapters:
Chapter 4, “Safety Precautions and Site Requirements” on page 81
Chapter 5, “Installing the Chassis in an Equipment Rack” on page 89
Chapter 6, “Installing the Power Supplies” on page 107
Chapter 7, “Installing the AT-SBx81CFC960 Controller and Ethernet
Line Cards” on page 127
Chapter 8, “Installing the Transceivers and Cabling the Ports” on page
143
Chapter 9, “Powering On the Chassis” on page 171
Chapter 10, “Verifying the Hardware Operations of the Chassis” on
page 209
Chapter 11, “Troubleshooting” on page 215
Chapter 12, “Replacing Modules” on page 231
Chapter 13, “Upgrading the Controller Fabric Card” on page 259
This manual is related to the following products: