beautypg.com

Allied Telesis AT-SBx81CFC960 User Manual

Page 166

background image

Chapter 8: Installing the Transceivers and Cabling the Ports

166

Section II: Installing the Chassis

After cabling the NET MGMT port, do one of the following:

To install and cable additional transceivers, go to the appropriate
section in this chapter for instructions.

After cabling all the ports in the chassis, go to Chapter 9,
“Powering On the Chassis” on page 171.

This manual is related to the following products: