Start-up, 3 start measurement of large version – KROHNE OPTISONIC 6300 EN User Manual
Page 61
START-UP
5
61
OPTISONIC 6300
www.krohne.com
07/2009 - 4000263902 - HB OPTISONIC 6300 R03 en
5.3 Start measurement of large version
Prepare installation
Prepare installation
Prepare installation
Prepare installation
• Power up the converter (do not mount and/or connect the rails yet)
• Fill in menu X1...X7 as described in section "Installation menu" in chapter "General
instructions for programming". Select "1 path" initially in X5
• X9.1: Check the reading with the sensor code (Ta/Tb) on rail
• X9.2: Check the reading with the calibration number on the nameplate
• X9.3: Check the factory preset number of traverses (default: 1 for Z-mode)
• X9.4: Read the advised mounting distance. Write it down, you need it later
• X9.5: Press enter
• X9.6: Press enter. Wait for 30 seconds
• X9.7: Press enter
• X9.8: Optimization loop. Enter "No" in X9.8.1
• X9.9: Press enter. Wait for 30 seconds
• X9.10: Path ready? Enter "Yes"
• X9.12: End Installation? Enter "Yes"
Figure 5-2: Procedure for installation of large version
1 Enter the values for the installation menu, X1...X9.8.4
2 Read the advised mounting distance in menu X9.8.5
3 Choose for Z-mode (default) or ...
4 Choose for V-mode
5 Finish the installation menu
.book Page 61 Tuesday, August 18, 2009 4:51 PM