C2-20 – Yokogawa YFGW710 User Manual
Page 141

C2-20
IM 01W01F01-01EN
6. Before starting the download, you can test the connection to the YFGW710. Push [Test
Connection] button. A popup message will indicate whether the connection is successful or
not and, in the latter case, the reason for the connection failure.
7. Press [Start Download]. A popup window will appear and request your confirmation to start
the download and also inform you about the restart necessity. Click [OK] to continue, or
[Cancel] to abort the download.
8. When the download starts, the Download Progress window opens, displaying a real-time
download progress report. From this window you can:
• By clicking [Cancel], cancel the download operation after confirmation. When the
download is complete, the button is no longer displayed.
• Save the report to a file named by default based on the following format: ProjectName_
NetworkID_CurrentDate (mmddyy) (e.g. Project_1-36-021110.dl.log”)
Figure C 2-18
9. If you are working on a new project that you have not saved before the download, you will
be prompted to save it.