Call scheduling, Introduction to call scheduling, Chapter 36 call scheduling – ZyXEL Communications Internet Security Gateway ZyWALL 2 Series User Manual
Page 503: 1 introduction to call scheduling

ZyWALL 2 Series User’s Guide
Call Scheduling
36-1
Chapter 36
Call Scheduling
Call scheduling allows you to dictate when a remote node should be called and for how long.
36.1 Introduction to Call Scheduling
The call scheduling feature allows the ZyWALL to manage a remote node and dictate when a remote node 
should be called and for how long. This feature is similar to the scheduler in a videocassette recorder (you 
can specify a time period for the VCR to record). You can apply up to 4 schedule sets in Menu 11.1 - 
Remote Node Profile. From the main menu, enter 26 to access Menu 26 - Schedule Setup as shown next. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 36-1 Schedule Setup
Lower numbered sets take precedence over higher numbered sets thereby avoiding scheduling conflicts. For 
example, if sets 1, 2, 3 and 4 are applied in the remote node, then set 1 will take precedence over set 2, 3 and 
4 as the ZyWALL, by default, applies the lowest numbered set first. Set 2 will take precedence over set 3 and 
4, and so on. 
You can design up to 12 schedule sets but you can only apply up to four schedule sets for a remote node. 
To delete a schedule set, enter the set number and press [SPACE BAR] and then
[ENTER] or [DEL] in the Edit Name field.
Menu 26 - Schedule Setup
 
 Schedule Schedule 
Set # Name Set # Name
------ ----------------- ------ -----------------
1 _______________ 7 _______________
2 _______________ 8 _______________
 3 _______________ 9 _______________ 
 4 _______________ 10 _______________ 
5 _______________ 11 _______________
6 _______________ 12 _______________
 
 
Enter Schedule Set Number to Configure= 0
Edit Name= N/A
Press ENTER to Confirm or ESC to Cancel:
