12 maintenance – Oritron Dionex Ion Chromatography System ICS-2100 User Manual
Page 80
ICS-2100 Ion Chromatography System
68
Doc. 065291-01 3/09
c.
Click Next > and select the in a new sequence via Sequence
Wizard option.
d. Click Next > to go to the Sequence Wizard.
e.
Complete the steps in the Sequence Wizard, adding the desired
number of samples and standards to the list. For help, click the
Help button on the Sequence Wizard page.
After you click Finish, a sequence is created and a program
appropriate for the selected application is copied to the sequence. If
you are using Chromeleon, a quantification method is also copied to
the sequence
.
5. Load the sequence and start batch processing:
a.
On the Sequence Control panel, click Load Sequence.
b. Select the sequence created in
Step 4
and click Open.
c.
Click Start Batch.
3.12 Maintenance
This section describes routine maintenance procedures that users may perform.
All other maintenance procedures must be performed by Dionex personnel.
As Needed
•
Regularly check the eluent reservoir and refill when needed.
Daily
•
Check the ICS-2100 component panel (see
) for leaks or spills.
Wipe up spills. Isolate and repair leaks (see
). Rinse off any dried
eluent with deionized water.
•
Check the waste container daily and empty when needed.
Weekly
•
Once a week, check fluid lines for crimping or discoloration. Replace any
pinched lines. Replace damaged lines.
•
Check the junctions between the pump heads and the pump casting for
evidence of liquid leaks. If the piston seal wash tubing is not connected, check
the drain tubes at the rear of the pump heads for evidence of moisture. Normal