5 • service – Oritron Dionex Ion Chromatography System ICS-2100 User Manual
Page 129
5 • Service
Doc. 065291-01 3/09
117
8. Also verify that the two splines on the pod align with the matching splines
inside the valve holder (see
Figure 5-12
). If necessary, twist the end of the pod
to adjust the position of the splines.
9. Push the pod into the holder until it clicks into place. Replace the black
locking ring.
10. Reconnect all liquid lines to the valve.
11. Turn on the pump flow. Check for leaks from the valve. Tighten fittings as
12. Close the door.
Figure 5-12. Valve Pod and Pod Holder
Slot (larger)
Splines
Runner (larger)
Valve Pod
Valve Holder