3 calibrating the conductivity cell, Calibrating the conductivity cell, Ll (see – Oritron Dionex Ion Chromatography System ICS-2100 User Manual
Page 115: Section 5.1.3
5 • Service
Doc. 065291-01 3/09
103
5.1.3
Calibrating the Conductivity Cell
When to Calibrate
•
After every 6 months of use
NOTE Do not use this procedure to calibrate a new cell. If you
are replacing a cell, see the instructions in
to install the new cell and calibrate it.
1. Open the ICS-2100 Wellness Panel in Chromeleon (see
), or open the touch screen
ELECTRIC
CONDUCTIVITY
CALIBRATION
page (see
Figure 5-3
).
Items Needed
Description
1.0 mM KCl solution
Prepare by dissolving 0.07456 g of reagent-
grade KCl in 1 liter of 18-megohm DI
water.
Backpressure tubing to provide
at least 7 MPa (1000 psi)
Use 0.076-mm (0.003-in) ID yellow PEEK
tubing (P/N 049715).
Figure 5-3. Electric Conductivity Calibration Page