3 . operation and maintenance, 1 operation overview, 3 • operation and maintenance – Oritron Dionex Ion Chromatography System ICS-2100 User Manual
Page 61: Operation overview
Doc. 065291-01 3/09
49
3 • Operation and Maintenance
This chapter describes routine operating and maintenance procedures for the ICS-
2100.
The ICS-2100 is designed for IC (ion chromatography) applications and should
not be used for any other purpose. Operation of the ICS-2100 in a manner not
specified by Dionex may result in personal injury.
3.1
Operation Overview
illustrates the basic steps for routine operation of the ICS-2100.
Figure 3-1. Operation Flow Chart
Power up the system
Set up the reservoir
(or RFIC-ER system)
Start Chromeleon
Check all
connections
Prime the pump
Set operating
conditions
Equilibrate the
system
Verify operating
status
Process samples
Prepare samples