16 priming the pump, 1 priming the eluent lines with a syringe, Section 5.16 – Oritron Dionex Ion Chromatography System ICS-2100 User Manual
Page 150: Section 5.16.1, Prime the pump (see
ICS-2100 Ion Chromatography System
138
Doc. 065291-01 3/09
7. Connect the cable from the new leak sensor (P/N 058053) to the ICS-2100
cable.
8. Feed the cables back inside the ICS-2100. Align the leak sensor with the
component panel opening and fingertighten the screw.
9. Make sure the leak sensor does not touch the bottom of the drip tray.
5.16 Priming the Pump
1. Verify that the eluent reservoir is filled, the reservoir cap is installed and hand
tightened, and the liquid line from the ICS-2100 to the reservoir cap is
connected.
2. Verify that the waste lines are directed to a waste container.
3. The priming procedure consists of two parts:
•
Priming the eluent lines with a syringe (see
). Perform this
procedure at initial installation, after changing eluents, or when eluent
lines are empty.
•
Priming the pump heads with the Prime button (see
Perform this procedure after the eluent lines are primed.
5.16.1 Priming the Eluent Lines with a Syringe
NOTE Prime the eluent lines after initial installation, after
changing eluents, or when eluent lines are empty.
1. Verify that the pump is turned off.
2. Connect a 10 mL syringe (P/N 054578) to the priming valve port on
the primary pump head (see
Figure 5-31
).