This section provides an overview of the steps necessary to install and power up the CPCI-
6115, any additional equipment requirements, and a brief section on unpacking and ESD
precautions. As identified in the following table, several steps can be omitted if your board has
been shipped with PMCs already installed.
2.4.1
Overview of Start-up Procedure
The following table lists the things you will need to do before you can use this board and tells
where to find the information you need to perform each step. Be sure to read this entire chapter,
including all Caution and Warning notes, before you begin.
Figure 2-2
CPCI-6115 Thermally Significant Components (Secondary Side)
U89
U96
U102
U101
Table 2-4 Startup Overview
Task
Section or Manual Reference
Page
Unpack the hardware
Unpacking and Inspecting the Board
Configure the hardware by setting jumpers
on the baseboard and transition module.
(CPCI-6115)
Jumper Settings
(CPCI-6115-MCPTM)
37
126