beautypg.com

7 electrical connection, 1 content and structure of the section – SMA SI 3.0-11 Installation User Manual

Page 24

background image

7  Electrical Connection

SMA Solar Technology AG

24

SI30M-44M-60H-80H-IA-en-30

Installation Manual

7 Electrical Connection

7.1 Content and Structure of the Section

The sub-sections differ in their structure. Some sub-sections refer to the correct connection of devices, others refer to basic

procedures.
An overview detailing which contents the sub-sections describe and which contents should be read and adhered to can

be found in the following table.

Section

Explanation

7.2 Connection Area

Graphic overview of the connection area

7.3 Connecting the Grounding Conductor

in Systems With Grounded Battery

For systems with grounded battery, this section must be read and

observed.

7.4 Connecting the Devices

Information on connection and circuitry of individual devices with

specification of connections on the Sunny Island

7.5 Connecting the Cables

Correct connection of the cables to the respective connections
You must read and observe the sections for the connections used.

7.6 Checking the Wiring

You must read and observe the section for the connections used.

7.7 Sealing and Closing the Sunny Island

You must read and observe this section.

7.8 Inserting the Fuse Links in the Fuse

Switch-Disconnector BatFuse

You must read and observe this section.

This manual is related to the following products: