7 electrical connection, 1 content and structure of the section – SMA SI 3.0-11 Installation User Manual
Page 24

7 Electrical Connection
SMA Solar Technology AG
24
SI30M-44M-60H-80H-IA-en-30
Installation Manual
7 Electrical Connection
7.1 Content and Structure of the Section
The sub-sections differ in their structure. Some sub-sections refer to the correct connection of devices, others refer to basic
procedures.
An overview detailing which contents the sub-sections describe and which contents should be read and adhered to can
be found in the following table.
Section
Explanation
Graphic overview of the connection area
7.3 Connecting the Grounding Conductor
in Systems With Grounded Battery
For systems with grounded battery, this section must be read and
observed.
Information on connection and circuitry of individual devices with
specification of connections on the Sunny Island
Correct connection of the cables to the respective connections
You must read and observe the sections for the connections used.
You must read and observe the section for the connections used.
7.7 Sealing and Closing the Sunny Island
You must read and observe this section.
7.8 Inserting the Fuse Links in the Fuse
You must read and observe this section.