beautypg.com

Denso RC5 User Manual

Page 119

background image

99

When issued with the Operation Preparation Start

 The figure below shows the input conditions and an operation timing

chart.

‚ Input Program Reset before Operation Preparation Start (1 msec. or

more).

ƒ After turned ON, this signal may take a maximum of one second for

initializing all programs. During the period, do not input signals to the
robot.

Input Conditions and Operation of Program Reset Signal