3-11. POST-INSTALLATION CHECKLIST
After completing the installation procedure, inspect carefully the connection between the Islander
PLUS and the external power mains and the data sources.
In particular, pay attention to the following issues:
• Correct wiring
o
Is all the wiring inserted in metal conduits?
o
Is the AC and the DC wiring inserted in separate conduits, throughs and so
on?
o
Is the system/peripheral equipment powered on a separate dedicated breaker?
o
Is the system grounded properly?
o
Are the cables correctly routed in the Island?
o
Are the communication lines under the maximum allowable distance?
RS-232: 50 feet (15m)
RS-485: 330 feet (100m)
Antenna wire:
• 330 feet (100m) for VIU
• 50 feet (15m) for FuelOpass
• Clean dirt and wire remnants
In case problems are detected after installation or during operation, repeat the post-installation
checks listed above.
CAUTION
The OrPT display should not be exposed to direct
sunlight. It is highly recommended to add an
awning.
3-12. ISLANDER PLUS SETUP
Please refer to the SiteOmat Setup Manual P/N MDE-4817
Islander PLUS Manual
80