Section 2 preliminary installation instructions, 1. general, 2. preliminary installation instructions – Gasboy Islander PLUS User Manual
Page 42: 2.1. general, 2.2. precautions and safety notes

0
SECTION 2
PRELIMINARY INSTALLATION INSTRUCTIONS
2-1.
GENERAL
This section provides the preliminary installation procedures for the Islander PLUS.
These procedures include:
• Preliminary instructions
• Wiring and Wire Conduits requirements
2-2.
PRELIMINARY INSTALLATION INSTRUCTIONS
2-2.1. General
NOTE
Perform a site survey of the station prior to
installation (see Appendix A)
Installation procedures and requirements depend, to some extent, on the specific fuel dispenser
models and the site layout. Therefore, use the information in this section to develop installation
plans for each specific installation. Since installation requirements vary widely from case to case,
no installation hardware is supplied by the equipment manufacturer, and installation planners must
develop their own requirements.
The customer should provide an installation plan, designed by an authorized engineer, and
applicable to all authorities. This plan design should reflect the existing electric infrastructure of
the site.
2-2.2. Precautions and Safety Notes
Prior to actual installation activities, carefully observe the precautions and safety notes below.
WARNING
Before installing or servicing equipment, carefully
observe the warnings and precautions provided at
the beginning of this manual.