beautypg.com

2 install the optional bearingless rack slide set – Comtech EF Data MBT-5000 User Manual

Page 31

background image

MBT-5000 L-Band Up/Down Converter System

MN-MBT5000

Installation

Revision 4

2–5

To install either kit, do these steps:

Step

Task

1

Use the #10 flat washers, #10 split washers, and #10 hex nuts to secure the #10 shoulder screws to the unit

chassis through the rear right and left side mounting slots.

2

Use the #10 rack bracket bolts to install the rear support brackets onto the rack enclosure threaded rear

mounting rails.

3

Mount the unit into the rack enclosure. Ensure that the shoulders of the #10 shoulder screws properly engage

into the rear support bracket slots.

2.2.2 Install the Optional Bearingless Rack Slide Set

If you wish to mount the converter on slides, you may install an optional bearingless rack slide

set (Figure 2-4) into the rack cabinet and onto the sides of the MBT-5000. Use the hardware

provided with the slide set that is appropriate for your specific installation:

CEFD Part Number

Description

FP/SL0006

Bearingless Rack Slide Set – 26”

FP/SL0007

Bearingless Rack Slide Set – 24”

FP/SL0008

Bearingless Rack Slide Set – 22”

To install any of these optional bearingless rack slide sets, do these steps:

Step

Task

1

Use the provided mounting hardware to install one slide onto each side of the MBT-5000 chassis,.

2

Use the provided mounting hardware to install the slide rail components into each side of the rack cabinet.

3

Mount the unit into the equipment rack – make sure that the slides properly engage the cabinet-mounted

slide rails.

4

Slide the converter into the rack cabinet until the front panel’s back surfaces abut the rack cabinet’s front

mounting rails.

5

Use four user-provided screws to secure the converter to the rack cabinet front mounting rails (see

Figure 2-2).