beautypg.com

2 install the unit into a rack enclosure – Comtech EF Data MBT-5000 User Manual

Page 28

background image

MBT-5000 L-Band Up/Down Converter System

MN-MBT5000

Installation

Revision 4

2–2

Once opened, inspect the shipment:

Step

Task

1

Keep all shipping materials.

2

Check the packing list to make sure the shipment is complete.

3

Inspect the equipment for damage. If damage exists, immediately contact the carrier

and Comtech EF Data to submit a damage report.

4

Read the manual.

2.2

Install the Unit Into a Rack Enclosure

Install the MBT-5000 in its assigned position in the rack enclosure (Figure 2-2). Use, as required:

• A standard rack-mounted shelf;

• User-supplied screws to secure the front panel to the rack enclosure threaded front

mounting rails;

• Comtech EF Data’s optional KT/6228-2 (4”) or KT/6228-3 (10”) Rear-Mounting Support

Brackets Kit (Figure 2-3);

• Comtech EF Data’s optional FP/SL0006 (26”), FP/SL0007 (24”), or FP/SL0008 (22”)

Bearingless Rack Slide Set (Figure 2-4).

For information about custom rack enclosures and these optional installation accessories,

contact Comtech EF Data Product Support.

CAUTION – OBSERVE THE FOLLOWING:

CORRECT GROUNDING PROTECTION IS REQUIRED TO PREVENT PERSONAL

INJURY AND EQUIPMENT DAMAGE.

You must make sure the ground stud on the rear panel of the unit is always

connected to the protective earth.

SUFFICIENT AIR VENTILATION IS REQUIRED – Make sure there is adequate air

ventilation clearance inside the enclosure, especially at the side. In a rack system

where there is high heat discharge, provide forced-air cooling with top- or

bottom-mounted fans or blowers.

MAXIMUM AIR TEMPERATURE – Make sure the air temperature inside the

enclosure

never

exceeds 50°C (122°F).