East Coast Supercharging Lysholm 2010+ Camaro Supercharger Kit User Manual
Page 56

P/N: 4LGE020-010 v1.1, 2011-04-29
© 2011 Lysholm
All Rights Reserved, Intl. Copr. Secured
46
Fig 6C
DRILL 11/64"
F. Set the reservoir assembly aside and drill in
the three marked locations with an 11/64” –
3/16” drill bit. See fig. 6C.
G. Attach the supplied 5/8” hose to the barb on
top of the reservoir and secure with a sup-
plied hose clamp.