9.2.3 Heat Section Controls

The ignition sequence depends on whether the heat section has staged control (YDSA

only) or modulation control (YDSA, YDHA, or YDMA).

FIGURE 25 -

Gas Heat

Control

Locations

The gas heat section controls are located on the left wall of the gas heat section.

75VA Transformer

Terminals

Venter Motor

Speed Controller

(AG73 & AG74)

Pressure Switches for Single Heat Section or

Right (first) Furnace in a Dual Heat Section

(See descriptions left.)

Relay (communicates with

the system controller)

DSI Control Module for

Single Heat Section or

Right (first) Furnace in

a Dual Heat Section

Pressure Switches for the Left (second)

Furnace in a Dual Heat Section

(See descriptions left.)

DSI Control Module for

the Left (second) Furnace

in a Dual Heat Section

Low Speed

Venter Switch

(AG73 & AG74)

Blocked Condensate

Switch (High Efficiency,

Condensing Furnace)

High Venter

(Combustion

Air) Switch

Blocked Condensate

Switch (High Efficiency,

Condensing Furnace)

High Venter

(Combustion

Air) Switch

Relay (communicates with

the system controller)

Staged Gas Control

(2-stage, Option AG71

or 4-stage, Option AG72

- apply to Model YDSA

only)

Sequence of Operation

1) W1 is energized and the controller verifies that the pressure switches are open.
2) Inducer (venter) is energized for pre-purge and the controller verifies that the low

pressure switch is closed.

3) After the pre-purge period has elapsed (20 seconds), the controller energizes the

trial for ignition period (17 seconds).

4) If W2 is energized, the high gas output will energize.
5) After W1 and W2 are de-energized, the controller will run the blower-off delay (120

seconds) and return to standby mode.

Modulating Gas Control

(5:1, Option AG73 or

10:1, Option AG74 -

apply to all models)

Sequence of Operation

1) W1 is energized and the controller verifies that the pressure switches are open.
2) Inducer (venter) is energized for pre-purge and the controller verifies that the low

and high pressure switches are closed.

3) After the pre-purge period has elapsed (20 seconds), the controller energizes the

trial for ignition period (17 seconds).

4) If W2 is energized, the high gas output will energize and the control will check for

high pressure switch input.

5) After W1 and W2 are de-energized, the controller will run the blower-off delay (120

seconds) and return to standby mode.