beautypg.com

0 electrical and wiring (cont'd), 5 control wiring (cont’d), 3 field wiring by control option (cont’d) – Reznor YDSA Unit Installation Manual User Manual

Page 30

background image

Form I-Y, P/N 273646R6, Page 30

Option BE17

Field Installed in the supply

air duct

Smoke Detector, P/N 159553,

Sampling Tube, P/N 259069

Wiring Connections -

DDC Monitored Smoke

Detector (photoelectric),

Option BE17, P/N 259076

12

24V

9

C

10

NC

OPTION BE17 - SMOKE DETECTOR

6

16

98

BL

*

IF SMOKE DETECTOR IS INSTALLED

*

REMOVE BLUE JUMPER

13

Option GF1

Wiring Connections

- Damper Positioning

Control from an External

0-10V Input Signal (field

provided), Damper

Control Option GF1

Option BE15 or

Option GF8

Wiring Connections - CO2 Sensor (Range 0-2000 ppm), Option BE15

and required for CO2 Sensor included in Damper Control Option GF8

(0-10V)

MANUAL

TO CUSTOMER'S

DAMPER CONTROL

{

U3

GND

CONTROL MODULE

OPTION GF1

97

FIRESTAT, OPTION BD5

N.C.

98

BL

IF FIRESTAT IS INSTALLED

REMOVE BLUE JUMPER

*

*

Option BD5

Wiring Connections - Firestat,

Option BD5

P/N 256957

P/N 42782

The firestat is shipped separately for field

installation in the return air and/or the supply

air duct. Comply with local building codes.

15

+

~

R

CO2 TRANSMITTER

OUT

(1)

W

G

16

16

+

~

R

OPTION BE15

OUT

(1)

W

96

Option BHB7

Wiring Connections - LON DDC Communication Bus, Option BHB7

G

BMS

CARD

SEE COMMUNICATION CARD INSTALLATION
INSTRUCTIONS FOR DETAILS

LONWORKS CARD INTERFACE CONNECTION

{

SHIELD

A

B

The programmed card is factory-installed in the controller. The wiring is field installed

using 22 gauge, twisted shielded pair wire. Be sure to install the shipped-loose Ferrite

Core around the communication connection.

Lon Card

Ferrite Core

Option GF4

Wiring Connections -

Damper Positioning Control

from Two field provided

Input Switches, Damper

Control Option GF4

15

94

15

95

Field-supplied

Damper Switch 1

Field-supplied

Damper Switch 2

Option BHB8

Wiring Connections - BacNet (MSTP) DDC Communication Bus, Option

BHB8

G

BMS

CARD

SEE COMMUNICATION CARD INSTALLATION

INSTRUCTIONS FOR DETAILS

BACNET MSTP INTERFACE CONNECTION

{

SHIELD

+
-

The programmed card is factory-installed in the controller. The wiring is field installed

using 22 gauge, twisted shielded pair wire. Be sure to install the shipped-loose Ferrite

Core around the communication connection.

BacNet Card

Ferrite Core

7.5 Control Wiring (cont’d)

7.0 Electrical and Wiring (cont'd)

7.5.3 Field Wiring by Control Option (cont’d)

This manual is related to the following products: