beautypg.com

AERCO Innovation (G-14-2265 and above) User Manual

Page 9

background image

Innovation Water Heaters Installation, Operation & Maintenance Manual

FORWARD

OMM-0078_0L

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 9 of

206

GF-128

Phone: 800-526-0288

PRI: 11/25/2014

Phrases, abbreviations and acronyms used in this manual are listed in the following table:

PHRASES, ABBREVIATIONS AND ACRONYMS

Phrase, Abbreviation

or Acronym

Meaning

A (Amp)

Ampere

ADDR

Address

AGND

Analog Ground

ALRM

Alarm

ASME

American Society of Mechanical Engineers

AUX

Auxiliary

BAS

Building Automation System, often used interchangeably with EMS
(see below)

Baud Rate

Symbol rate, or simply the number of distinct symbol changes
(signaling events) transmitted per second. It is not equal to bits per
second, unless each symbol is 1 bit long.

BLDG (Bldg)

Building

BTU

British Thermal Unit. A unit of energy approximately equal to the heat
required to raise 1 pound of water 1°F.

CCP

Combustion Control Panel

C-More Controller
(or Control Box)

A control system developed by AERCO and currently used in all
Benchmark, Innovation and KC1000 Series product lines.

CO

Carbon Monoxide

COMM (Comm)

Communication

Cal.

Calibration

CNTL

Control

DBB

Double Block & Bleed. Used to define gas trains containing two
SSOVs and a solenoid operated vent valve. Used interchangeably
with IRI.

DIP

Dual In-Line Package

EMS

Energy Management System; often used interchangeably with BAS

FM

Factory Mutual. Used to define boiler gas trains.

GND

Ground

HDR

Header

HX

Heat Exchanger

Hz

Hertz (Cycles Per Second)

I.D.

Inside Diameter

IGN

Ignition

IGST Board

Ignition/Stepper Board contained in C-More Control Box

INN

Innovation Water Heater

INTLK (INTL’K)

Interlock

I/O

Input/Output

I/O Box

Input/Output (I/O) Box currently used on Benchmark, Innovation and
KC1000 Series products