9 ssov proof of closure switch – AERCO Innovation (G-14-2265 and above) User Manual
Page 74
Innovation Water Heaters Installation, Operation & Maintenance Manual
CHAPTER 5 – SAFETY DEVICE TESTING
Page 74 of
206
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
OMM-0078_0L
PRI: 11/25/2014
Phone: 800-526-0288
GF-128
PARTIAL REAR VIEW
Figure 5-5. Water Heater Rear View Showing Air Inlet Location
5.9 SSOV PROOF OF CLOSURE SWITCH
The SSOV shown in Figure 5-1 contains the proof of closure switch. The proof of closure switch
circuit is checked as follows:
SSOV Proof of Closure Switch
1.
Set the unit’s ON/OFF switch to the OFF position.
2.
Place the unit in Manual Mode and set the valve position between 25% and 30%
3.
Refer to Figure 5-1 and locate the SSOV.
4.
Remove the cover from the SSOV by loosening the screw shown in Figure 5-6. Lift off the
cover to access the terminal wiring connections.
5.
Disconnect wire #148 from the SSOV to “open” the proof of closure switch circuit.
6.
The unit should fault and display SSOV SWITCH OPEN.
7.
Replace wire #148 and press the CLEAR button.
8.
Set the ON/OFF switch to ON to start the unit.
9.
Remove the wire again when the unit reaches the purge cycle and PURGING is
displayed.
10.
The unit should shut down and display SSOV FAULT DURING PURGE.
11.
Replace the wire on the SSOV and press the CLEAR button. The unit should restart.
AIR INLET
EXHAUST
MANIFOLD
COLD WATER
INLET
DRAIN
VALVE