Brookfield DV-III Ultra Rheometer User Manual
Page 84
Brookfield Engineering Laboratories, Inc.
Page 84
Manual No. M/98-211-B0104
Brookfield Engineering Laboratories, Inc.
Page 84
Manual No. M98-211-E0912
When the test is allowed to run to completion, one of the following screens (Figures IV-78 through
IV-81) are displayed:
Figure IV-78 is displayed when the yield test passes. The % torque and stress (in Pa) at the point
of yield are displayed along with the temperature (in °C) at the conclusion of test.
#5: Sample Tst S:71
TEST COMPLETE
%=73.56 TEMP=025.5
YIELD=0726.4 Pa
Figure IV-78
Figure IV-79 is displayed when the yield test fails due to an over-range error.
#5: Sample Tst S:71
YIELD ERROR
OVER-RANGE
PRESS ESC OR ENTER
Figure IV-79
Figure IV-80 is displayed when the yield test fails due to an under-range error.
#5: Sample Tst S:71
YIELD ERROR
UNDER-RANGE
PRESS ESC OR ENTER
Figure IV-80
Figure IV-81 is displayed when the yield test fails due to the resultant yield stress exceeding the
user defined limits. The actual yield stress measured during the test is displayed in the first field to
the right of the "Yield=", while the limiting value causing the failed test (high or low yield stress)
is displayed in the second field.
#5: Sample Tst S:71
LIMIT ERROR
YIELD=726.436 (200.0)
PRESS ESC OR ENTER
Figure IV-81
After screens IV-78 through IV-81 are displayed, pressing the MOtOr ON/OFF/eSC key returns
the screen to Figure IV-70. At this point, after ensuring the appropriate spindle is attached, the
eNter
key can be pressed to run the test again. Pressing the eNter key when any of these screens
is displayed immediately runs the test again and displays the first appropriate Run screen (Figure
IV-72 through IV-75). When the test is complete, the results are sent out of both the parallel and
serial (RS-232) ports.