22

Chapter 4 Install the system

Welch Allyn Wireless Acuity LT Central Monitoring System

To apply power to Acuity LT System components

1.

Apply power in this order:

a.

Printer

Insert the toner cartridge and add paper.

Plug into AC power.

Do not plug the printer into a UPS.

Turn on the printer power.

b.

UPS 1

Plug the UPS 1 power cord into an AC power outlet.

Press the UPS 1 power buttons to apply power to the switch, PoEs and APs.

c.

If your system includes 4-7 APs, repeat the steps in

Step b

for the additional UPS.

d.

UPS 2, CPU and Acuity LT Central Station display(s)

Plug the UPS 2 power cord into an AC power outlet.

Press both UPS 2 power buttons to apply power.

If the CPU does not start up, press the front-panel power button.

Turn on the Acuity LT Central Station display power.

For a 28-patient system, also turn on the second display.

2.

Verify that LEDs are active on the following devices:

UPSs

CPU

Switch

PoEs

APs