S-5500 SSG and Captured Corner Mullion Installation Instructions

Section X: Vertical Splice Joints

Installation for SSG System






NOTE: All anchors must be fixed before glazing begins.

Note: The vertical structural

glazed system should be spliced

as close as possible to a
horizontal to minimize the shear

stress imposed on the vertical

structural silicone joint.