beautypg.com

EFCO S5500 SSG Captured User Manual

Page 46

background image


EFCO CORPORATION 6/2012

PART NO. Y556

Page 46 of 81

S-5500 SSG and Captured Corner Mullion Installation Instructions

Section VII: Glazing Preparation

(Vertical SSG and Captured Horizontal)







CAPTURED HEAD AT SSG CORNER

Apply two beads of sealant in the

reglets of the corner mullion where
the corner mullion glazing adapter

mates into the corner mullion.

Seal between the mitered

ends of the heads and the
corner mullion. Fill all voids

completely, and tool smooth.

CAPTURED

HEAD

CORNER

MULLIONS

SSG CORNER

MULLION GLAZING

ADAPTER

Seal the end of the corner

mullion glazing adapter to
the corner mullion.

Attach the glazing adapter to the

corner mullion with the required
fasteners. Cap seal the fastener

heads with sealant. Fasteners

should not exceed 2” from the ends

of the adapters and must be spaced

at a maximum of 12” o/c.

STEP #3 GLAZE SSG CORNER

Refer to Section XI “Glaze SSG corners on page 73.