beautypg.com

EFCO S5500 SSG Captured User Manual

Page 39

background image


EFCO CORPORATION 6/2012

PART NO. Y556

Page 39 of 81

S-5500 SSG and Captured Corner Mullion Installation Instructions

Section VI: Glazing Preparation (SSG)






Apply two beads of sealant in the
reglets of the corner mullion where

the corner mullion glazing adapter

mates into the corner mullion.

Seal between the mitered
ends of the heads and the

corner mullion. Fill all voids

completely, and tool smooth.

Note: The corner mullion glazing adapter

must be set immediately after this step
before the sealant begins to cure.

SSG HEAD

CORNER

MULLIONS

HEAD AT SSG CORNER

SSG CORNER

MULLION GLAZING

ADAPTER