beautypg.com

EFCO S5500 SSG Captured User Manual

Page 29

background image


EFCO CORPORATION 6/2012

PART NO. Y556

Page 29 of 81

S-5500 SSG and Captured Corner Mullion Installation Instructions

Section V: Glazing Preparation (Captured)





Apply two beads of sealant in the

reglets of the corner mullion where

the corner mullion glazing adapter

mates into the corner mullion.

Seal between the mitered ends of the

heads and the corner mullion. Fill all

voids completely and tool smooth.

HEAD AT CAPTURED CORNER

Note: The corner mullion glazing adapter
must be set immediately after this step

before the sealant begins to cure.

CAPTURED

HEAD

CORNER

MULLIONS