S-5500 SSG and Captured Corner Mullion Installation Instructions

Section II: Frame Unit Assembly & Frame Sealing

Captured System



Note: Sealant must be applied to the ends of

each horizontal member before assembly.

STEP #1 ASSEMBLE FRAMING MEMBERS

Frame assembly screws
1/4” –14 x 1 1/2”

HWSMS 18-8 Typical

90 DEGREE CAPTURED

CORNER AT SILL

SILL

Mitered end

of sill

CORNER

MULLION HALF

CORNER

MULLION HALF

Apply sealant to the ends of

the horizontals as shown.

Apply sealant between the

thermal struts as shown, and

tool smooth.

SILL

After each frame unit
assembly is complete,

wipe off all excess

sealant and allow the

frame unit to cure.

Refer to “Section II: Frame
Unit Assembly &

Frame

Sealing” of the Series 5500

Outside Glazed or Inside

Glazed Installation

Instructions for additional

information.