beautypg.com

EFCO S5500 SSG Captured User Manual

Page 16

background image


EFCO CORPORATION 6/2012

PART NO. Y556

Page 16 of 81

S-5500 SSG and Captured Corner Mullion Installation Instructions

Section III: Typical Anchorage Methods







STANDARD HEAD ANCHORAGE

Install PVC pocket filler

at frame assembly for

captured system.

Snap in head and sill fillers

after anchor installation.

Anchor bolts (type and
quantity as required by

conditions and loads).

CAPTURED SYSTEM

SHOWN – SSG SYSTEM

SIMILAR

SPLIT CORNER

MULLIONS

PIPE SLEEVE

ANCHOR

BUILDING

STRUCTURE

HEAD