beautypg.com

EFCO S5500 SSG Captured User Manual

Page 44

background image


EFCO CORPORATION 6/2012

PART NO. Y556

Page 44 of 81

S-5500 SSG and Captured Corner Mullion Installation Instructions

Section VII: Glazing Preparation

(Vertical SSG and Captured Horizontal)







CAPTURED INTERMEDIATE

HORIZONTALS AT SSG CORNER

CORNER

MULLIONS

CAPTURED

INTERMEDIATE

HORIZONTAL

CAPTURED

INTERMEDIATE

HORIZONTAL

SSG CORNER

MULLION GLAZING

ADAPTERS

STEP #2 SET AND ATTACH CORNER MULLION GLAZING ADAPTER

A. Apply sealant to the bottom end of the corner mullion glazing adapter.

B. Insert the end of the corner mullion glazing adapter as shown in the detail below.
C. Fill all voids completely, and tool the sealant smooth on the bottom end of the corner

mullion glazing adapter.

D. Attach the glazing adapter to the corner mullion with the required fasteners.

E. Cap seal the fastener heads at all fastener penetrations.