beautypg.com

EFCO S5500 SSG Captured User Manual

Page 60

background image


EFCO CORPORATION 6/2012

PART NO. Y556

Page 60 of 81

S-5500 SSG and Captured Corner Mullion Installation Instructions

Section IX: Vertical Splice Joints

Installation for Captured System





STEP #5 ATTACH MULLION ADAPTER AND ADAPTER SPLICE SLEEVE

A. Install the corner mullion adapter as shown in “Section V Glazing Preparation (Captured)” of

this manual. The adapter should be cut to mullion length, starting and stopping at the mullion

splice joint.

B. Apply bond breaker tape to the mullion adapter splice sleeve.
C. Attach the mullion adapter splice sleeve to the upper corner mullion adapter.

D. Apply sealant to fill the void between the corner mullion adapters and the splice sleeve.

E. Tool the joint smooth as shown in the inset detail. The gasket reglets must be free of sealant.

MULLION ADAPTER

SPLICE SLEEVE

Apply sealant to fill the void

between the adapters and

splice sleeve, and tool smooth.

BOND BREAKER

TAPE

SPLICE ATTACHMENT

SCREWS (cap seal)

ADAPTER ATTACHMENT

SCREWS (cap seal)