EFCO CORPORATION 6/2012

PART NO. Y556

Page 13 of 81

S-5500 SSG and Captured Corner Mullion Installation Instructions

Section III: Typical Anchorage Methods















STEP #2 INSTALL FRAME COMPONENTS

A. After the first corner frame is set into the opening plumb and in the proper position with

regard to established benchmarks, anchor the frame at the head, sill and intermediate

floor slab if required.

B. Stack the next corner frame into the opening, and mate the corner mullions together as

shown in the illustration below.

C. Anchor the second corner frame into the opening, as required, after it is level and plumb.

Slide corner mullions

together, and anchor

as required.

CORNER

MULLION HALF

CORNER

MULLION HALF

STACK CORNER MULLIONS

ASSEMBLED

CORNER FRAMES