Ring, Sensor, and Special Installations

4-3

Preparing for Installation

The QS3600 flow monitor is delivered fully assembled and tested. The installation
process includes

l

assembling the ring,

l

mounting the sensors,

l

connecting sensor cables to the monitor,

l

installing the ring in the sewer pipe, and

l

installing the monitor in the manhole.

Note:

Refer to Chapter 5 for information on installing the monitor and

software, as well as on activating and confirming the monitor.

Before beginning installation, determine the types and quantities of installation supplies
required, and obtain those items. See page 4-4 for a list of the required supplies. You
should also conduct a thorough investigation of hydraulic and other site conditions.
The hydraulics of a site directly affect the monitor's ability to accurately measure flow
depth and velocity values. Measure the horizontal and vertical pipe dimensions
carefully.

When installing the monitor, verify that the monitor is configured correctly for the
applications being supported, verify that the correct baud rate has been set, and make
any necessary changes to the configuration before mounting the unit.