Wheatheart X160 Series User Manual
Page 85

W
HEATHEART
- G
RAIN
A
UGERS
3. A
SSEMBLY
X160-85, X160-105, X160-125
30875 R0
85
Figure 3.39 Secure Bushing Support and Connect Transition Flight
7. Raise and support the hopper tube spout head on a stand about 50” high.
8. Open the service door on the transition, then bring the intake hopper and
transition together guiding the transition flight shaft into the u-joint (Figure
9. Attach the transition to the intake hopper with two 5/8” x 2” bolts and 5/8”
locknuts. Tighten to a slightly loose fit only as these bolts act as pivot points
(Figure 3.40), then close and secure the service door. DO NOT over-tighten.
12
13
15 11
6
5
8
9
10
7
14
16