Pre-operation, Checklist – Wheatheart X160 Series User Manual
Page 115

W
HEATHEART
- G
RAIN
A
UGERS
6. O
PERATION
X160-85, X160-105, X160-125
30875 R0
115
6.2. PRE-OPERATION
6.2.1. C
HECKLIST
• Tighten all fasteners.
• Adjust and/or lubricate boot chain and hopper chain.
• Ensure auger rotates freely.
• Check that tire pressure is within the manufacturer’s specification.
• Ensure wheel bolt torque is within specification.
• Check hopper winch and lift cables for damage (fraying, kinking, unraveling).
Replace as required.
• Ensure that the cable anchor on the winch drum is secure.
• Check gearbox oil levels.
• Grease and clean machine if needed.
• Ensure hydraulic system is functioning, is free of leaks, and the hoses are not
pinched or kinked.
• Ensure that electrical hoses are in good condition.
• Ensure that electrical connections are in place and secure.
• Ensure that equipment guards are in place and secure.
• Check that truss cables are free from damage (fraying, kinking, unraveling).
Cables must be tight and properly adjusted for proper auger tube alignment.
• Ensure that the PTO shaft is properly installed.
• Ensure that the intake area and discharge spout are free of obstructions.
• Ensure that the tractor and auger are in line or as close to being in line as
possible.
• Ensure that the tractor park brake is engaged and/or wheels are chocked.
• Ensure that the axles are extended.