Rockwell Automation 5000,D50006.2.10 PI INSTALLATION MANUAL User Manual
Pyramid integrator
Table of contents
Document Outline
- 5000-6.2.10, Pyramid Integrator, Installation Manual
- Important User Information
- Summary of Changes
- Table of Contents
- Preface - Using This Manual
- 1 - Preparing for Installation
- 2 - Mounting the Components
- Chapter Objectives
- To Mount the System Components
- Gather the Mounting Documentation
- Gather the PI Components
- Gather the Tools and Supplies
- Rack Mount the Components
- Panel Mount the Components
- Mount the Fan Assembly
- Mount the Camera
- Mounting a Black and White Monitor (2801-N6, -N9, -N20)
- Mounting the I/O Board 1771-JMB
- What to do Next
- 3 - Grounding the Components
- 4 - Installing the Modules
- Chapter Objectives
- How to Use this Chapter
- Help to Prevent Electrostatic Damage
- Lithium Battery Information
- Gather the Module Documentation
- Power Supply
- RM/KA Module
- RS Module
- LP Module
- Vision Processor Modules
- MicroVAX Information Processors
- EI Module
- OSI Carrierband/Broadband Interface Module
- Configuring the PI OSI Interface Module
- OSI Interface
- 5 - Installation the Peripherals
- 6 - Installing the Vision Components
- 7 - Installing 1771 I/O
- Chapter Objectives
- What You Should Have Completed
- Before You Begin
- Set I/O Chassis Switches
- Set the I/O Chassis Configuration Jumper
- Set I/O Adapter Module Switches
- Configure the Extemded-Local I/O Adapter Module
- Set 1771-AM1, -AM2 I/O Chassis/Adapter Switches
- Install Keying Bands
- Installing and Wiring I/O Modules
- Connecting Shielded Cables
- Connecting I/O Power Supplies
- What to do Next
- 8 - Installing Non-standard I/O
- 9 - Connecting the I/O Link
- Chapter Objectives
- Connecting the Remote I/O Link
- Connecting the Extended-Local I/O Link On the RS5 Modules
- Connecting to a 1771-AM1, -AM2 I/O Chassis with Integral Power Supply and Adapter
- Connecting to a 1785 PLC-5 Controller
- Connecting to a Direct Communication Module
- Connecting to a RediPANEL Module
- Connecting to a PLC Interface Module
- Connecting to a PanelView Operator Terminal
- What to do Next
- 10 - Connecting ac Power
- 11 - Checking the Hardware
- 12 - Configuring Hardware for the MicroVAX Information Processors EP and EE
- A - Installing and Removing a Module
- B - Mounting Dimensions
- C - Cable Connections for the Resource Manager and KA Module
- D - Start Up and Configure the Modules
- Index
- Back Cover