Step 7, Seam-loc 24 – Metal Sales Seam-Loc 24 Installation User Manual
Page 33

© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 12/03
800.406.7387 (Corporate Office) • www.metalsales.us.com
32
SEAM-LOC 24
®
I
NSTALLATION
OF
P
ANEL
(
CONT
.)
Note: It is critical that sealants be properly placed to prevent moisture leakage.
Steps:
1. Apply a
3
/
8
" bead of Tube Sealant along the vertical male leg of the panel directly over the Double Bead Tape
Sealant on the metal inside closure. Be sure the Tube Sealant joins with the Double Bead Tape Sealant.
2. Apply a 3/8" bead of Tube Sealant 6" long across to top of the male leg.
3. Peel back the paper backing covering the Double Bead Tape Sealant at the eave flashing previously installed.
Gutter Drip
Seam-Loc 24 Panel
Double Bead Tape Sealant
Male Leg
STEP
7
SIDELAPPING OF PANEL
Tube Sealant
Gutter Drip
Double Bead Tape Sealant
Tube Sealant