E84AYCER communication manual (PROFINET)

Commissioning

Before initial switch-on

34

L

EDS84AYCER EN 2.0 - 11/2010

6

Commissioning

During commissioning, system-specific data such as motor paramters, operating

parameters, responses, and parameters for fieldbus communication are specified for the

controller. In the case of Lenze devices this is carried out via the so-called codes.
The controller and communication codes are saved non-volatilely as a data record in the

memory module.
In addition there are diagnostic and monitoring codes for the nodes.

Parameter reference

( 78)

6.1

Before initial switch-on

Stop!

Before switching on the standard device and the communication module for the

first time, check the entire wiring for completeness, short circuit and earth fault.