Brocade BigIron RX Series Hardware Installation Guide
53-1002483-03
Installing a BigIron RX-8 switch
2
Installing a BigIron RX-8 switch
This section describes the following tasks:
•
“Preparing the installation site”
•
“Unpacking a BigIron RX-8 switch”
•
“Chassis lifting guidelines for BigIron RX-8 switches”
•
“Installing the BigIron RX-8 chassis in a rack”
•
“Installing BigIron RX-8 modules”
•
“Installing power supplies in the BigIron RX-8 chassis”
•
“Connecting AC power to a BigIron RX-8 chassis”
•
“Connecting DC power to a BigIron RX-8 chassis”
•
Preparing the installation site
Cabling infrastructure
Ensure that the proper cabling is installed in the site.
For information on cabling, refer to
“Installing power supplies in the BigIron RX-8 chassis”
“Attaching a management station”
on page 54, and
“Connecting a BigIron RX Series
Installation location
Before installing the switch, plan its location and orientation relative to other devices and
equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front,
and the back of the chassis and walls or other obstructions. If a chassis is installed within a
perforated enclosure, the perforations must have openings of at least 60 percent of the surface.
Unpacking a BigIron RX-8 switch
The BigIron RX-8 switch ships with several items. Review the list below, and verify the contents. If
any items are missing, contact the place of purchase:
•
BigIron RX-8 chassis with the appropriate number of switch fabric modules already installed in
the slot marked SF and slot blanks installed in all other module slots.
NOTE
You must provide standard #12-24 pan-head screws for mounting the BigIron RX Series chassis into
a rack.
•
A 115V AC power cable for each AC power supply you purchase from Brocade.
Follow the steps given below to unpack a BigIron RX-8 chassis.
1. Move the pallet to a staging area as close to the installation site as possible.
2. Position the shipping carton with the arrows pointing up.