beautypg.com

2 installation checklist – IEI Integration WAFER-945GSELVDS2 User Manual

Page 55

background image

WAFER-945GSELVDS2

Page 43

ƒ Turn all power to the WAFER-945GSELVDS2 off:

o

When working with the WAFER-945GSELVDS2, make sure that it is

disconnected from all power supplies and that no electricity is being fed

into the system.

Before and during the installation of the WAFER-945GSELVDS2 DO NOT:

ƒ Remove any of the stickers on the PCB board. These stickers are required for

warranty validation.

ƒ Use the product before verifying all the cables and power connectors are

properly connected.

ƒ Allow screws to come in contact with the PCB circuit, connector pins, or its

components.

4.2.2 Installation Checklist

The following checklist is provided to ensure the WAFER-945GSELVDS2 is properly

installed.

ƒ All the items in the packing list are present

ƒ A compatible memory module is properly inserted into the slot

ƒ The CF Type I or CF Type II card is properly installed into the CF socket

ƒ The jumpers have been properly configured

ƒ The WAFER-945GSELVDS2 is inserted into a chassis with adequate

ventilation

ƒ The correct power supply is being used

ƒ The following devices are properly connected

o

SATA drives

o

Power supply

o

USB cable

o

Serial port cable

o

Keyboard and mouse cable

ƒ The following external peripheral devices are properly connected to the

chassis:

o

VGA screen

o

USB devices