Preventive maintenance schedule, Ransburg, Mma-570 preventive maintenance schedule – Ransburg MMA-570 Direct_Ind Charge Atomizer A13366 User Manual
Page 56: Mma-570 direct/indirect charge - maintenance

MMA-570 PREVENTIVE MAINTENANCE SCHEDULE
Procedure
Yearly
6 Months
3 Months
Monthly
2 Weeks
Weekly
End of Shift
Mid-Shift
Mid Shift Cleaning
• Wipe electrodes
• Wipe shroud
• Visually inspect cup
End of Shift Cleaning
• Wipe electrodes
• Wipe shroud
• Wipe bell cup down
• Change cloth cover
Shaping Air Shroud
• Clean inner shape air ring
• Clean outer shape air ring
• Remove and clean
Bell cup removal/inspection/
cleaning
Fluid tip inspection/cleaning
Inspect Valve and Seat
Assembly in valve module
for leaking
Replace Valves and Seats
in valve module
High Voltage Cable
Inspections
High Voltage Testing
Regreasing of High Voltage
Cables
Check resistance of High
Voltage Electrodes
Regreasing Electrode
Cavities of High Voltage
Ring and High Voltage Input
Inspect all screws
• Replace if broken
• Inspect for wear
• Tighten per specifications
Inspection of Electrode
Replace Electrodes
Inspection of Tubing Bundle
Regrease Tubing Bundle
Replace Tubing Bundle
Replace High Voltage Cable
Inspect Turbine Spindle
taper and threads
Frequency (Maximum)
•
•
•
•
•
• •
• •
•
•
• •
•
•
•
•
•
•
•
• •
•
•
•
•
MMA-570 Direct/Indirect Charge - Maintenance
Ransburg
LN-9279-13
53