Put out of commission
Place the elevator on a pallet or pallets with specially cut supports and with
the electrical cabinet upwards. Secure the elevator with straps. The eleva-
tor must be well protected and strapped during transport.
At the moment a elevator is put out of operation for some reason, a number
of steps are to be taken in order to avoid dangerous situations. This section
clearly indicates how one should proceed in a number of cases with re-
spect to uncoupling, dismounting, transport and reuse of materials coming
from the elevator
8.1
Disconnect the power sources
Prior to starting the dismounting, the voltage is to be cut off from the power
source. First the main switch is to be switched off before the power source
can be disconnected.
.
Danger: First switch off the main switch before the power source
may be disconnected.
8.2
Disassemble
While dismounting the machine, the regulations for waste processing ap-
plicable on the place and at the time of the dismantling are to be complied
with. The machine only contains commonly known materials. At the time of
assembling the elevator there were processing possibilities for this and no
particular risks were known for persons involved in dismantling. The disas-
sembly of the elevator generally requires few operations. The elevator can
be disposed of in the same way as it was delivered.
.
Note! At the time of assembling the elevator there were
processing possibilities for this and no particular risks were