Electrical installation and controls

5.3.1

Electrical installation

During this phase all necessary cabling is connected to elevator and appli-
cation code software for controlling the elevator is downloaded to the line
controller (IPC/PLC) as well as the fieldbus hardware configuration.

Reference to the electrical documentation for the version in question.

Figure 19 Cabling example

Cabling:

Power supply

Fieldbus

Safety

Equipotential bonding

400 V AC
24 V DC
ES-loop

Fieldbus
Equipotential bonding

Module

A001