2 validation – FlexLink Elevator Руководство пользователя User Manual
Page 50

Installation and adjustment
42
5112204
5.3.2
Validation
The purpose of the validation phase is to prepare the elevator for test run.
The validation is performed with empty elevator. No products in elevator.
Reference to electrical documentation.
Action
Remark
Power on
- Motor supply
(Version dependent. 50 Hz: 400 V AC, 60 Hz: 480 V AC)
- 24 V DC
Voltage check
Check equipotential bonding.
Check voltages. Turn elevator control box circuit breakers
on.
Safety check
Check that safety system is working properly.
- Service door can be opened and cause motor power
supply disconnection. Closing the door enables safety
reset.
- Emergency switch activation cause motor power supply
disconnection. Deactivating the switch enables safety
reset.
Where disconnections are made is version dependent.
Manual sensor I/O-check
Important: Service door must be open preventing motions.
Make sure all sensor signals reach the communication
interface in control box. The sensors are activated
manually. (Inductive sensors are activated with metal.)
Limit switches are excluded.
Maneuver interface check
Important: Service door must be open preventing motions.
Make sure all push button signals reach the communication
interface in control box.