2.3 Generator System Sensor Verification, continued

2.3.2 AC and DC line Sense Verification

The ECM monitors AC line and DC bus status to determine when to start and

stop the APU. In the event of an extended power outage or low battery bus

voltage the ECM will start the APU. The following test will verify these

functions.

1. Verify the ECM is in the Auto position, the APU is not running, and there are

no major or minor alarms reported other than “Tamper”. Remove the DC

sense cable from the front of the ECM (see figure 1-5). Verify the APU

starts running and the ECM reports a minor “DC Bus Fault” alarm. Replace

the DC sense cable and verify the alarm clears.

NOTE:

As the ECM will continue to run the APU for 30 minutes

after the “DC Bus Fault” alarm clears, the technican

may move the RAS switch to the STOP position after 4

to 5 minutes

2. Verify the RAS switch is in the Auto position, the APU has run for 1 minute.

Remove the AC Utility Line sense cable from the front of the ECM (see Fig.

1-5). Verify the ECM reports a “line Failure” notification and the APU starts

running after a 3 minute time delay. Replace the AC Utility Line sense cable

and Verify the notification clears. Verify the APU will continue to run for a 12

minute “cool down” period after the “Line Failure” notification clears.